EPoNa.PNG

26.04.2017

Groundbreaking

In the course of the kick-off event the groundbreaking took place at the EPoNa site in Outapi to start construction work. Representatives of Outapi Town Council (OTC) and the German delegation rolled up their sleeves and got to work, thus collectively marking the beginning. At the same time the local press and neighboring municipalities used the opportunity to inform themselves about the planned activities.

Print Email

26.04.2017

Visit of the Wastewater Treatment Pond in Oshakati and Ongwediva

The wastewater treatment ponds in Oshakati and Ongwediva were visited subsequent to the workshop.

Print Email

26.04.2017

Sponsorship EGLV

Based on the initiative of Dr.-Ing. Emanuel Grün and Prof. Dr.-Ing. Peter Cornel, Emschergenossenschaft and Lippeverband (EGLV) undertook a perennial sponsorship to support the wastewater plants in Outapi. EGLV seeks to support OTC in their sustainable operation of the existing (CuveWaters) and future (EPoNa) site through qualified personnel. Herman Neumbo (OTC), Prof. Dr. Susanne Lackner (IWAR) and Dr.-Ing. Emanuel Grün (EGLV) officially signed the agreement on April 26th, 2017 in the presence of the press and the notability of Outapi.

Print Email

18.04.2017

Factsheet

The EPoNa factsheet is now available. Just in time for the kick-off event. It provides an overview with the depiction of the project, the Namibian and German partners as well as contact information. You can find the factsheet here.

Print Email

28.03.2017

Just in time for the trade fair Wasser Berlin International EPoNa was presented in two water journals:

  • March Issue of WASSER und ABFALL. You can find it here.
  • WaterSolutions Issue 1/2017. You can find it here.

Print Email

Casino Bonus at bet365 uk